{{ variable.name }}
The GCU10 high-altitude configuration adds an altitude oxygen compensation intake port for plateau locomotive and coach air systems. Project records cover 300 units operating at altitudes up to 5,000 m with stable pressure and delivery. The design temperature range is -40 °C to +50 °C, and oil carry-over is ≤3 ppm for oxygen/nitrogen generation duty. Base performance remains 5-11 kW, 0.7-1.1 m³/min at 7 bar, 12.5/5 bar, 40 kg and 375x353x470 mm.
| Parameter | Value |
|---|---|
| Model | GCU10 high-altitude configuration |
| Type | Integrated screw airend with oxygen compensation intake |
| Power | 5-11 kW |
| FAD at 7 bar | 0.7-1.1 m³/min |
| Working pressure | Max 12.5 bar / min 5 bar |
| Altitude capability | Up to 5,000 m (project case) |
| Temperature design | -40 °C to +50 °C |
| Oil carry-over | ≤3 ppm |
| Noise | ≤75 dB(A) |
| Net weight | 40 kg |
| Dimensions (L×W×H) | 375x353x470 mm, excl. air filter assembly |
| Integrated configuration | Screw airend + oil-gas separator tank + 3 filters + 4 valves |
| Housing | High-grade cast iron; aluminium-alloy housing under development |
| Rotors | Forged alloy steel |
| Bearings | SKF heavy-duty rolling bearings |
The housing is high-grade cast iron, with an aluminium-alloy housing under development. Rotors are forged alloy steel with a German-designed patented profile. Bearings are SKF heavy-duty rolling bearings. The shaft seal uses triple-sealing technology. The oil separator combines a built-in coarse separator with an oversized external fine separator.
Altitude oxygen compensation intake configuration is available for plateau projects. Standard mounting interfaces and technical drawings are provided for OEM and assembler projects. Filter configuration can be reviewed against the air treatment train.
Plateau locomotive/coach oxygen supply project. 300 units over 2 years for clean water-free compressed air for on-board oxygen and nitrogen generation. The units operate at altitudes up to 5,000 m with stable pressure and delivery. Design features include altitude oxygen compensation intake, -40 °C to +50 °C design and oil carry-over ≤3 ppm.
Aftermarket replacement project. Approximately 300 units shipped cumulatively over 2 years. CE-compliant supply; purchase cost 25-30% lower than comparable European airends with equivalent performance. Drop-in replacement dimensions and 4-5 week lead time vs. 8-10 weeks for imports.
Project records show operation at altitudes up to 5,000 m with stable pressure and delivery.
It is an intake port configuration that compensates for thin air at plateau sites. Configuration is project-specific.
Oil carry-over is ≤3 ppm. The airend is used with an air dryer and precision filter in the oxygen/nitrogen generation train.
The design range is -40 °C to +50 °C.
In the aftermarket case, the unit offered drop-in replacement dimensions, CE-compliant supply and 4-5 week lead time vs. 8-10 weeks for imports.
CE for the 2.2-45 kW scope (TUV Rheinland), ISO 9001:2015 and IATF 16949:2016.
Overseas Sales Team
Email: service@woyo.cn | Tel: +86 510 8599 6655 | WhatsApp: +86 189 1237 9878
Address: No.5 Changkang Road, Mashan, Binhu District, Wuxi, Jiangsu, China



