{{ variable.name }}



This fuel tank coating line is the tank configuration of the automatic automotive parts coating platform. Tanks are carried on pallets by a supported conveyor in offline mode, sprayed by robots inside a stainless steel booth held at 25 ± 2 °C and 65 ± 10% RH, and cured in a high-temperature curing oven before unloading.
The reference line data is 45 s per pallet, about 1760 pallets per day on a 336-day, 22-hour working year at 85% equipment utilisation, with pallets up to 1350 × 900 × 200 mm inside a 100 m × 38 m × 5.4 m building envelope. Tank fixtures, loading orientation and booth access are engineered against your tank drawings, since tank geometry differs widely between vehicle programmes.
| Line type | Fuel tank coating line |
|---|---|
| Workpieces | Fuel tanks (fixtures engineered per tank drawing) |
| Process stages shown | Pretreatment, stainless steel spray booth, high-temperature curing oven, supported conveyor |
| Spraying method | Offline mode + robotic spraying |
| Pallet cycle | 45 s/pallet; 1760 pallets/day |
| Max fixture pallet | 1350 × 900 × 200 mm |
| Spray booth condition | 25 ± 2 °C; 65 ± 10% RH |
| Working system | 336 days/year; 22 h/day |
| Equipment utilisation | 85% |
| Line envelope | 100 m × 38 m × 5.4 m |
| Main frame / booth | Carbon steel frame; stainless steel booth and piping |
| Energy supply | Electricity, natural gas, steam, chilled water |
The platform covers bumper coating line, alloy wheel coating line, wheel hub cap coating line, fuel tank coating line, frame coating line, automotive interior parts coating line and car logo coating line. This page describes the fuel tank configuration; the frame coating line shares the same large-part pallet standard for long structural components.
Carbon steel carries the main structural loads of the line, while booth panels and piping are stainless steel. The transfer system is a supported conveyor that moves loaded pallets between pretreatment, spraying and curing. Electricity, natural gas, steam and chilled water are distributed to the booth conditioning and oven sections.
Automotive parts plants coating fuel tanks and comparable large hollow or long components that need a robot-sprayed finish and an in-line bake. It suits suppliers running a fixed takt with limited manual handling inside the spray zone.
Attractivechina handles pre-sales plant planning, design, manufacturing, installation, commissioning and after-sales in one scope, and adapts the layout and fixtures to the buyer's tank range, building volume and output target. The company holds 79 invention patents and more than 300 patents in total and works from a 35,548 m² factory with 54 engineers.
What is this tank line configured to coat?
It is the fuel tank configuration of the automotive parts coating platform. Fixtures and loading orientation are engineered per tank drawing.
Which stations does the line include?
Pretreatment, a stainless steel spray booth with robotic spraying, a high-temperature curing oven and a supported pallet conveyor.
What cycle time and output are quoted?
45 s per pallet in the reference configuration, equal to 1760 pallets per day on a 336-day, 22-hour working year at 85% equipment utilisation.
What is the maximum pallet size?
1350 × 900 × 200 mm (L × W × H), the largest pallet in the reference data.
What booth climate and utilities are required?
Booth at 25 ± 2 °C and 65 ± 10% RH; utilities are electricity, natural gas, steam and chilled water.
How much space does the line occupy?
The reference envelope is 100 m × 38 m × 5.4 m; pre-sales plant planning is used to fit the layout to your building.
Send tank drawings and output targets for a line configuration review
SEO Title: Fuel Tank Coating Line with Stainless Steel Booth and Robot Spraying
Meta Description: Fuel tank coating line with a stainless steel spray booth, offline conveyor transport, robotic spraying and a high-temperature curing oven for large parts.
URL Slug: /fuel-tank-coating-line