🌍 FWK Lianggong Formwork Since 2010 ⭐ 16+ Year Industry Experience ✓ Verified Elite Supplier
✓ Verified Elite Supplier
Menu
5+ Verified Cases from 5 Countries

Project Cases

Explore our comprehensive portfolio of successful formwork and shoring projects across diverse industries and regions, demonstrating reliability, efficiency, and innovation.

5+Verified cases
5Countries & regions
5Application sectors
96%On-time delivery

Customer Success Stories

Filter by industry, market or product type to find a comparable implementation.

5 cases shown
MY
For pipe laying in municipal drainage pipeline projectsProduct

Municipal engineering company

Construction period is shortened by 20%, which not only saves a large amount of reinforced concrete materials, but also achieves zero safety accidents, and construction efficiency is improved by 4 times.

10 setsQuantity
more than 10 yearsDuration
RU
For wallProduct

Construction company

Prefect

25 setsQuantity
2 yearsDuration
IL
For pipe layingProduct

Construction company

Israel is characterized by sandy and loose soil in many areas. The Trench Box effectively mitigates the risk of trench collapse, while eliminating the need for extensive slope cutting in urban construction sites with limited space and dense underground utilities, thereby significantly reducing the volume of earth excavation

3 setsQuantity
2 yearsDuration
TT
For WallProduct

construction company

In a major healthcare infrastructure project in Trinidad and Tobago, LIANGGONG Hydraulic Auto-Climbing Formwork System (ACS) was successfully applied to the construction of the hospital’s reinforced concrete core structures and vertical shear walls. The project required high standards of safety, precision, and construction efficiency due to its complex structural design and tight schedule. The hydraulic auto-climbing formwork system, powered by its integrated hydraulic lifting mechanism, enabled the entire formwork assembly to climb steadily without reliance on tower cranes or external lifting equipment. This significantly reduced crane usage on site while ensuring continuous and uninterrupted vertical construction. The system’s ability to allow synchronized or independent climbing of brackets and rails ensured smooth and stable operation throughout the project, even under challenging site conditions. During construction, the system remained wall-attached and did not require dismantling or reinstallation at ground level, which optimized site space and minimized material damage. The integrated multi-level working platforms provided safe and efficient access for workers, eliminating the need for additional scaffolding and greatly improving overall site safety management. The project team benefited from the high climbing efficiency of the ACS system, completing each structural level within a shortened cycle time and accelerating the overall construction schedule. At the same time, the system’s high construction accuracy allowed for easy alignment adjustment, ensuring that structural deviations were corrected floor by floor, meeting strict engineering tolerances required for hospital construction. With its self-climbing capability, reduced labor intensity, and enhanced safety performance, the LIANGGONG Hydraulic Auto-Climbing Formwork System proved to be an ideal solution for this hospital project. The successful implementation not only ensured timely project delive

70 unitsQuantity
2 yearsDuration
No matching cases. Try changing the filters.

Have a Similar Project?

Share your site conditions, required dimensions and application. Our engineering team will recommend a comparable solution.

Project Case