UHV/EHV overhead transmission line insulation, desert and industrial pollution zone grid constructionProduct
National Grid Corporation, Power Transmission EPC Contractor
zero line-tripping incidents, maintenance cost reduced by 70%, 100% visual defect detection (no live-line testing required), pollution flashover incidents reduced by 85% vs porcelain baseline.
200,000 pcs total(Uzbekistan 80,000 pcs, Ukraine 70,000 pcs, Iraq 50,000 pcs)Quantity
2 years Until 2026 (Uzbekistan), 3 years Until 2026(Ukraine), 3 years Until 2026 (Iraq)Duration