🌍 SULONG Since 2007 ⭐ 19+ Year Industry Experience ✓ Verified Elite Supplier
✓ Verified Elite Supplier
Menu
Verified Project Evidence

Project Cases

Explore our proven project cases across railway, metro, undersea tunnel and mining applications, demonstrating reliable ventilation solutions and on-time delivery.

5+Verified cases
4Countries & regions
4Application sectors
100%On-time delivery

Customer Success Stories

Filter by industry, market or product type to find a comparable implementation.

5 cases shown
AU
Underground Tunnel VentilationProduct

Melbourne Metro Rail Project

The Melbourne Metro Rail Project involves the construction of a 9km-long tunnel within Melbourne, Australia, connecting the Sunbury and Dandenong railway route. Construction is scheduled to begin in late-2018 and operations are expected to start in 2025. We have have supplied the vent ducts of 1500mm diameter since 2019.

9 kmQuantity
3 yearsDuration
HK
Undersea road tunnel construction temporary ventilationProduct

Trunk Road T2 Tunnel

The Trunk Road T2 Tunnel is an important component of Hong Kong Route 6 and a key undersea tunnel project connecting Kowloon and Tseung Kwan O. Constructed using tunnel boring machines (TBM), it avoided large-scale land reclamation, minimizing its impact on the marine environment. It is approximately 3.4 kilometers long, including about 2.1 kilometers of undersea tunnel.

5 kmQuantity
2 yearsDuration
CN
Underground tunnel construction temporary ventilationProduct

Guangxi Beibu Gulf Project

The project undertaken by China Water Resources and Hydropower 14th Engineering Co., Ltd. in the Beibu Gulf region of Guangxi is a major national water conservancy project with a total length of 30 kilometers. The project uses domestically advanced slurry balance shield tunneling machines (about 4 meters in diameter) to specifically address the challenges of the Beibu Gulf region's abundant water and complex geology.

30 kmQuantity
3 yearsDuration
GLOBAL
Primary Forced Ventilation and Hazardous Gas Dilution for Buritică Gold MineProduct

Global Tier-1 Mining Conglomerate and EPC Contractor

100% stable, continuous operation with a zero defect and rejection rate, ensuring the supply of fresh underground air and compliance with safety standards for multinational mine audits.

20km per yearQuantity
3 yearsDuration
No matching cases. Try changing the filters.

Have a Similar Project?

Share your site conditions, required dimensions and application. Our engineering team will recommend a comparable solution.

Project Case