About FWK Lianggong Formwork
Thanks to over 14 years of abundant factory experience, Lianggong has won high praise from customers both domestically and internationally for our exceptional product quality and outstanding after-sales service.
Furthermore, Lianggong has a professional technical department that collaborates with the sales department to ensure our customers' needs are fully satisfied. We provide a one-stop service, offering products that are available off-the-shelf or can be customized according to your preferences.
Moreover, Lianggong has implemented a quality management system that complies with international standards. We also welcome OEM and ODM orders. For more information, please get in touch with us.
Our Products
View All Products →
Precast Box Culvert Formwork with Fixed Workstation for Panama Projects
Model: Box Culvert Formwork
Parameters: 7341102403
Aluminum Skydeck Panel System 90KN/m² Load Capacity FWK-SKYDECK
Model: FWK-SKYDECK
Parameters: 4227039444
Q235B Curved Steel Formwork FWK-CS55 for Concrete Bridge Piers
Model: FWK-CS55
Parameters: 7758966659
Customizable Curved Steel Formwork for Curved Walls with Adjustable Radius
Model: FWK-CS55
Parameters: 1911112198
Hydraulic Tunnel Lining Trolley 12m Steel Formwork System
Model: Hydraulic Tunnel Lining Trolley
Parameters: 5797078155
Standard Steel Pipe Gallery Trolley TC-120 for Construction Site Pipe Transport
Model: TC-120
Parameters: 4852573654
Heavy Duty Steel Prop AEP-30 for High-Load Construction Support
Model: Heavy Duty Steel Prop AEP-30,Heavy Duty Steel Prop AEP-20,Universal Steel Prop 60,Universal Steel Prop 48
Parameters: 1354308662
Universal Steel Prop AEP-20 Adjustable Height 1450-5500mm
Model: Heavy Duty Steel Prop AEP-30,Heavy Duty Steel Prop AEP-20,Universal Steel Prop 60,Universal Steel Prop 48
Parameters: 7082426666
Universal Steel Prop 60/48 Lightweight Adjustable 15kN Support
Model: Heavy Duty Steel Prop AEP-30,Heavy Duty Steel Prop AEP-20,Universal Steel Prop 60,Universal Steel Prop 48
Parameters: 7232268394
Heavy Duty Steel Prop AEP-30 30kN Adjustable Support for Construction
Model: Heavy Duty Steel Prop AEP-30,Heavy Duty Steel Prop AEP-20,Universal Steel Prop 60,Universal Steel Prop 48
Parameters: 8619075470
Heavy Duty Steel Prop AEP-20 20kN Adjustable Support for Tall Heights
Model: Heavy Duty Steel Prop AEP-30,Heavy Duty Steel Prop AEP-20,Universal Steel Prop 60,Universal Steel Prop 48
Parameters: 004460923X
Universal Steel Prop 60 15kN Adjustable Support for General Formwork
Model: Heavy Duty Steel Prop AEP-30,Heavy Duty Steel Prop AEP-20,Universal Steel Prop 60,Universal Steel Prop 48
Parameters: 1042864500
Universal Steel Prop 48 15kN Compact Adjustable Support for Light Formwork
Model: Heavy Duty Steel Prop AEP-30,Heavy Duty Steel Prop AEP-20,Universal Steel Prop 60,Universal Steel Prop 48
Parameters: 8627122865
Ring-Lock Stair Tower with 150m Height and 37.5kN Load Capacity
Model: Ring-Lock Stair Tower
Parameters: 8156260104
48mm Ring-Lock Scaffolding System with 100kN Load Capacity
Model: 48mm System, 60mm System
Parameters: 4510406665
60mm Ring-Lock Scaffolding System with 130kN Load Capacity
Model: 48mm System, 60mm System
Parameters: 5663234330
Ring-Lock Scaffolding 48mm System 100kN Load Capacity Q355B
Model: 48mm System, 60mm System
Parameters: 6466774317
Ring-Lock Scaffolding 60mm System 130kN Load Capacity Q355B
Model: 48mm System, 60mm System
Parameters: 9238530785
Adjustable Shaft Beam Platform 1.45m-5.8m for Concrete Construction
Model: Shaft Beam Platform
Parameters: 4084318434
Company Gallery
Certifications & Awards
Success Stories & Case Studies
EPC contractor
The Kalimantan Dam Project is a key infrastructure development aimed at supporting regional water management and energy supply. The structure involves large-volume concrete casting, complex wall geometries, and high structural stability requirements, making it particularly demanding for formwork systems in terms of strength, adaptability, and durability.
To meet these challenges, the contractor selected Lianggong’s H20 Timber Beam Formwork System for the main wall and structural concrete works. The system demonstrated strong adaptability on site, especially in handling irregular and curved sections of the dam structure. Its flexible configuration allowed for efficient adjustments without complicated redesign, ensuring continuous workflow even under changing construction conditions.
Throughout the construction process, the timber beams and panels could be freely cut and reused, significantly improving material utilization. At the same time, the system maintained excellent load-bearing performance during large-scale concrete pouring, ensuring both safety and structural accuracy. The relatively lightweight components also made handling and installation more efficient, helping the project team accelerate the construction schedule.
In addition, the system delivered a high-quality concrete surface finish, reducing the need for extensive post-processing work. This not only improved overall construction efficiency but also contributed to better cost control across the project.
The successful application of the H20 Timber Beam Formwork System in the Kalimantan Dam Project highlights its reliability and versatility in large-scale infrastructure works, especially in projects requiring both structural strength and on-site flexibility.
The concrete pouring achieves not only qualified strength but also a smooth and level finish, eliminating the need for additional grinding work, which significantly improves overall construction efficiency.
Municipal engineering company
Construction period is shortened by 20%, which not only saves a large amount of reinforced concrete materials, but also achieves zero safety accidents, and construction efficiency is improved by 4 times.
The panels are made of Q355B steel with extremely high strength, capable of withstanding huge lateral earth pressure.Quick to assemble and disassemble, easy to operate and master.Support installation can follow excavation progress, with shoring applied as digging proceeds, greatly shortening the construction period.Flexible in size with adjustable width, and panels can be customized.Customization service is available, providing exclusive design solutions and technical guidance.
Construction company
Prefect
Durable and sturdy
Construction company
Israel is characterized by sandy and loose soil in many areas. The Trench Box effectively mitigates the risk of trench collapse, while eliminating the need for extensive slope cutting in urban construction sites with limited space and dense underground utilities, thereby significantly reducing the volume of earth excavation
Ge adaptability:In certain areas of Israel , the soil is sandy and lacks self-standing capacity. Traditional open-cut with slope cutting is prone to collapse, making the trench box a highly efficient and safe solution.
Efficiency Advantages:Featuring a modular design, the trench box enables rapid assembly and lowering. Compared to steel sheet pile shoring, it offers faster construction speed and lower costs, along with zero vibration and low noise. It is ideally suited for urban construction environments.
Compliance Requirements:Israel’s construction safety codes mandate shoring support for deep trench operations. The trench box is a standard protective equipment that fully complies with local standards.
construction company
In a major healthcare infrastructure project in Trinidad and Tobago, LIANGGONG Hydraulic Auto-Climbing Formwork System (ACS) was successfully applied to the construction of the hospital’s reinforced concrete core structures and vertical shear walls. The project required high standards of safety, precision, and construction efficiency due to its complex structural design and tight schedule.
The hydraulic auto-climbing formwork system, powered by its integrated hydraulic lifting mechanism, enabled the entire formwork assembly to climb steadily without reliance on tower cranes or external lifting equipment. This significantly reduced crane usage on site while ensuring continuous and uninterrupted vertical construction. The system’s ability to allow synchronized or independent climbing of brackets and rails ensured smooth and stable operation throughout the project, even under challenging site conditions.
During construction, the system remained wall-attached and did not require dismantling or reinstallation at ground level, which optimized site space and minimized material damage. The integrated multi-level working platforms provided safe and efficient access for workers, eliminating the need for additional scaffolding and greatly improving overall site safety management.
The project team benefited from the high climbing efficiency of the ACS system, completing each structural level within a shortened cycle time and accelerating the overall construction schedule. At the same time, the system’s high construction accuracy allowed for easy alignment adjustment, ensuring that structural deviations were corrected floor by floor, meeting strict engineering tolerances required for hospital construction.
With its self-climbing capability, reduced labor intensity, and enhanced safety performance, the LIANGGONG Hydraulic Auto-Climbing Formwork System proved to be an ideal solution for this hospital project. The successful implementation not only ensured timely project delive
Easy assembly
Company & Product Videos
Company Introduction & Factory Tour
⏱ Duration: 3:45 | 👁 Views: 15,230
Product Demonstration - Kestrel K-1
⏱ Duration: 5:12 | 👁 Views: 28,450
Technology Innovation Showcase
⏱ Duration: 4:30 | 👁 Views: 12,890
Customer Testimonials & Success Stories
⏱ Duration: 6:20 | 👁 Views: 9,650
Ready to Transform Your Life?
Contact us immediately to learn how our products meet your needs.