{{ variable.name }}
Collector-side oil-immersed transformer with two low-voltage split windings and a 34.5 kV output, built for co-located solar farms and battery energy storage plants.

8 MVADual LV split winding34.5 kV outputHarmonic load toleranceIEEE C57
This 8 MVA oil-immersed substation transformer is designed for hybrid renewable plants where PV inverters and battery power conversion systems share one grid connection point. Two low-voltage split windings allow a single unit to serve multiple converter groups, while the 34.5 kV output feeds the plant collector system for a stable grid interconnection. High thermal margin insulation and harmonic-tolerant design address the fluctuating, converter-driven load profile of solar and storage duty. The unit is part of a substation and power transformer line spanning 150 kVA to 1000 MVA and 2.4 kV to 1000 kV, all built to project specification.
Two low-voltage split windings let one transformer serve separate converter groups, simplifying collector design for co-located PV and storage blocks.
A single 8 MVA unit delivers a stable 34.5 kV collector voltage for renewable energy grid interconnection and dispatch.
The insulation system is sized with thermal margin so daily load cycling from solar output and storage dispatch does not erode service life.
Designed to tolerate inverter and PCS harmonics typical of hybrid renewable plants, supporting power quality at the point of interconnection.
Project build follows IEEE C57 requirements, with ANSI/IEEE C57, CSA C88, AS 60076, IEC 60076 and DOE efficiency als
| Rated capacity | 8 MVA |
|---|---|
| Output voltage | 34.5 kV collector level |
| Low-voltage windings | Dual split winding architecture |
| Insulation system | High thermal margin insulation |
| Harmonic performance | Specified for harmonic load resistance from inverters and PCS |
| Cooling | ONAN / ONAF / OFAF / ODAF, project-specified |
| Tap changer | OLTC or DETC |
| Core and conductors | Grain-oriented silicon steel core, copper or aluminum windings |
| Standards | IEEE C57 project build; line also offered to ANSI/IEEE C57, CSA C88, AS 60076, IEC 60076, DOE efficiency |
| Testing | Routine and project-specified FAT with serialized reports |
| Lead time | 10 to 20 weeks typical; 13-week delivery achieved on the referenced solar storage project |
| Warranty | 24 months from B/L date, extendable to 5 years |
Capacity, winding split, impedance and cooling are configurable around the 8 MVA reference point. Ancillary options include conservator or sealed-tank construction, porcelain or polymer bushings, air terminal chambers, and integrated Buchholz relay, pressure relief device and temperature indicators.
Low-loss grain-oriented silicon steel cores and precision-wound copper or aluminum conductors are combined with oil-immersed cooling to keep losses and temperature rise controlled under cyclic loading. Manufacturing takes place in 45,000 m2 facilities under ISO 9001, ISO 14001 and ISO 45001 certified systems.
Winding split ratio, impedance, tapping range, cooling class and protection scope are engineered per project. Drawings and factory test plans are approved before production begins.
A U.S. renewable energy developer ordered one 8 MVA transformer for a utility-scale solar farm combined with a battery energy storage system. The unit was delivered with a dual low-voltage split winding architecture, high thermal margin insulation and harmonic load resistance, built to IEEE C57 requirements.
Why use a dual split winding instead of a standard two-winding unit?
Two low-voltage split windings allow one transformer to serve separate inverter or PCS groups, which reduces the number of transformers and interconnecting cables on the collector system.
Is this transformer suitable for storage-only projects?
Yes. It is applied to solar-plus-storage and hybrid renewable plants, where charge and discharge cycles plus PV output create the fluctuating load profile the design is specified for.
How do you handle inverter harmonics?
The transformer is specified for harmonic load resistance, and impedance and thermal design are set against the converter harmonic spectrum supplied with the project data.
What is the typical lead time?
Standard lead time is 10 to 20 weeks depending on capacity and specification; a 90-day delivery was achieved on the referenced solar storage project.
Are factory test reports supplied?
Yes. Routine and project-specified factory acceptance tests are performed and serialized reports are issued before shipment.
Share your inverter and PCS output, collector voltage, harmonic data and site ambient conditions for a project-specific design proposal.
Contact: Mr. Steven
Email: steven@winley-electric.com
Tel: 86-18650108051
WhatsApp: +8618650108051
Address: No. 99 Yilan Road, Siming, Xiamen, Fujian, China
SEO Title: 8 MVA Dual-Split Winding Transformer for Solar and Storage Plants
Meta Description: 8 MVA dual-split winding substation transformer for co-located solar and battery storage plants. 34.5 kV output, IEEE C57 design, 90-day project delivery.
URL Slug: 8mva-solar-storage-dual-split-transformer