{{ variable.name }}
| Type | Safety rods coating lines, wheeling lines, wheel covers, oil tank paint lines, frame coating lines, car interiors, car logos. | Model | Car parts coating line. |
| Parameters | 1. Name of the work: the front safety pole, the door set, the support panel, the change panel, the board set, the wheel arch, the switchboard 2. Work materials: ABS+PC 3. Work system: 336 working days per year, 22 hours per day 4. Spray chamber temperature: 25 ± 2 °C 5. Vaccination chamber humidity: 65 § 10% RH 6. Spray method: offline mode + droid spray 7. Period of birth: 45 seconds/tray (1760 pallets/days) 8. Maximum installed tray size: 1350* wide 900* high 200 mm 9. Equipment utilization: 85 per cent 10. Plant size: 100 m (long)* 38 m (wide)* 5.4 m (high) 11. Energy consumption: electricity, natural gas, steam, ice water | Materials | Carbon steel (Main frame), no steel (painting room and pipe) |
| Appliance industries | Car parts. | ||

Allotmental rims.

High temperature solidifier

Car parts coating line.

High temperature solidifier

Dragon Front Processing System

Allotmental rims.

The safety pole line.

Preprocessors

Supported delivery system

Fuel tank coating tube

Allotmental rims.

Allotmental rims.

Fire Room

Preprocessors

The safety pole line.

Allotmental rims.

Round-cover coating series

Car logo layer series

Allotmental rims.

Preprocessors
