{{ variable.name }}
| Type | Bumper coating line, wheel bushing coating line, wheel hub cap coating line, fuel tank coating line, chassis coating line, automobile interior parts coating line | Model | Auto parts coating line |
| Parameters | 1. Part name: front bumper, door panel trim, auxiliary instrument panel, gear shift lever panel, instrument panel trim, wheel arches, switch panel 2. Part material: ABS + PC 3. Working system: 336 days/year; 22 h/day 4. Paint booth temperature: 25 ± 2 °C 5. Paint booth humidity: 65 ± 10 % RH 6. Painting method: offline mode + robotic painting 7. Production cycle: 45 seconds/tray (1760 trays/day) 8. Maximum tool tray size: 1350 mm (length) x 900 mm (width) x 200 mm (height) 9. Equipment utilization rate: 85 % 10. Factory dimensions: 100 m (length) x 38 m (width) x 5.4 m (height) 11. Energy consumption: electricity, natural gas, steam, chilled water | Material | Carbon steel (main structure), stainless steel (paint booth and piping) |
| Applicable industry | Auto parts industry | ||

Alloy wheel coating line

High-temperature curing oven

Auto parts coating line

High-temperature curing oven

Gantry pretreatment system

Alloy wheel coating line

Bumper coating line

Pretreatment equipment

Compatible conveyor system

Fuel tank coating line

Alloy wheel coating line

Alloy wheel coating line

Flame treatment booth

Pretreatment equipment

Bumper coating line

Alloy wheel coating line

Wheel hub cap coating line

Car logo coating line

Alloy wheel coating line

Pretreatment equipment